Lake Lynn Laboratories

(2007) – NIOSH testing of the new Hellblaster system is planned. USFE&S will be working closely with NIOSH to take various measurements and temperature readings to determine the full effectiveness of the jet engine inert exhaust gases compared to the use of our nitrogen generator units.

Contact USF

800 E Cotton Street
Longview, Texas 75602

(800) 595-FOAM (3626)